![]() Major feats of planning and new logistical achievements on a daily basis to intelligently guide the technical crews and the masses of visitors daily through each individual construction phase. ![]() This meant not only involving all fit-out and technical trades, but also obtaining approvals from all responsible authorities to master challenges such as the placement of a 600-ton crane that was used to lift new technical elements onto the roof. This demanding task would not have been possible without intensive preparation, as this large-scale project had to be coordinated continuously during ongoing operations. ![]() Around the clock, seven days a week: We built a new, glamorous shopping promenade on behalf of the mall operator, ECE.